O-Train resumes two-track service after emergency track adjustments
Ottawa's light-rail transit system is running full service between Blair and Tunney's Pasture stations on two tracks, after emergency repairs were conducted for "further track adjustments" on the restraining rail on the eastern section of the track.
OC Transpo announced normal service resumed on the O-Train just after 8 p.m. Thursday, 10 hours after LRT service was reduced to a single-track between uOttawa and Hurdman stations when inspections discovered contact between the restraining rail and the wheels of an LRT vehicle.
O-Train service was reduced to every 15 minutes between Tunney's Pasture and Blair stations on Thursday, while the transit service urged commuters travelling from downtown directly to Tunney's Pasture or Blair to take the express bus instead of the LRT.
Transit riders reported packed trains and station platforms, and long waits for buses during the reduced service on Thursday, with some riders saying the trip from Lyon Station to Hurdman Station took 40 minutes.
Service resumed on the full O-Train line on Monday, four weeks after the LRT service was shut down following the discovery of an issue with the axle bearing on one train during routine maintenance. OC Transpo and Rideau Transit Group are running single-car trains along the LRT route.
As part of the return-to-service plan, Rideau Transit Group and Alstom said there can be no contact between the restraining rail and the wheels of the LRT vehicles. Rideau Transit Maintenance adjusted 16 restraining rails at eight locations along the LRT line before service resumed between uOttawa and Blair stations.
However, Transit Services acting general manager Michael Morgan said "further track adjustments" were needed on Thursday in the area of the track between Hurdman Station and the Rideau River Bridge to avoid contact between the restraining rail and the wheel hub of the LRT vehicles. OC Transpo implemented single-track service between uOttawa and Hurdman stations, causing long waits for commuters.
"Rideau Transit Group (RTG) was able to complete adjustments to the restraining rail this evening, and O-Train Line 1 service safely resumed on both tracks and at all platforms shortly before 8 p.m." Morgan said in a memo to Council Thursday evening.
"As previously described, the Safety Note from RTG and Alstom requires that there be no contact between the restraining rail and wheels as part of the safe return to service plan. After completing adjustments to the restraining rail, testing was conducted to ensure that any contact was eliminated, and trains can operate safely. As a result, Line 1 service was able to safely resume in the section of the affected track."
Morgan says full service on the Confederation Line will operate at all stations on Friday. The Shuttle Express bus service will operate in the morning and afternoon peak periods to provide an alternate option for customers travelling from Blair or Tunney's Pasture stations to downtown.
"OC Transpo, RTG and Alstom continue to closely monitor and inspect the track and trains to ensure ongoing safe operations for our customers and employees," Morgan said.
"Inspections of restraining rails are done weekly in order to identify if additional adjustments are necessary."
CTVNews.ca Top Stories
India's foreign minister reacts to murder charges, claims Canada welcomes criminals
India's Foreign Affairs Minister accused Canada of welcoming criminals from his country in response to the RCMP's recent arrests in a homicide that has roiled tensions between the two countries.
15-year-old boy stabbed in Ottawa on Thursday dies
A 15-year old boy who was critically injured after a stabbing in Nepean on Thursday has died of his injuries, Ottawa's English public school board said Sunday.
Dash cam catches moment suspected drunk driver hits parked car, sends it careening into North Shore flower shop
Police say it’s fortunate no one was injured or killed in a collision at North Vancouver’s Park and Tilford shopping centre Saturday evening that sent one vehicle careening into a flower shop and another into a set of concrete barriers outside a Winners store.
Actor Bernard Hill, of 'Titanic' and 'Lord of the Rings,' has died at 79
Actor Bernard Hill, who delivered a rousing cry before leading his people into battle in 'The Lord of the Rings: The Return of the King' and went down with the ship as the captain in 'Titanic,' has died.
'A tiny city:' Pro-Palestinian campus protesters organize for another week
Pro-Palestinian activists have set up tents at universities in Toronto, Ottawa, Vancouver and Montreal, following a wave of similar protests at campuses in the United States linked to the Israel-Hamas war.
Lawsuit against Meta asks if Facebook users have right to control their feeds using external tools
Do social media users have the right to control what they see — or don't see — on their feeds?
A Holocaust survivor will mark that history differently after the horrors of Oct. 7
This year's Holocaust Remembrance Day, which begins on Sunday evening in Israel, carries a heavier weight than usual for many Jews around the world.
Princess Anne lays wreath at Battle of Atlantic ceremony; honours late Queen
Princess Anne saluted Canadian veterans and current forces members and honoured her late mother during separate ceremonies Sunday in Victoria as she wrapped up a three-day British Columbia West Coast royal visit.
El Nino weakening doesn't mean cooler temperatures this summer, forecasters say
As Canadians brace themselves for summer temperatures, forecasters say a weakening El Nino cycle doesn’t mean relief from the heat.