LRT construction delays keeping footbridge near Carleton campus incomplete
A much-anticipated footbridge connecting Carleton University to Vincent Massey Park has been sitting unused for nearly two years, and the delay has everything to do with light rail construction.
Ian Marsland, a cyclist eager to use the bridge, says the link between the university and Vincent Massey's vast network of recreational pathways on the other side of the Rideau River is not only a much-needed gateway but also reduces travel time to other destinations like the RA Centre and Billings Bridge.
Location of the much-anticipated footbridge connecting Carleton University to Vincent Massey Park over the Rideau River. (CTV News Ottawa)
"It's going to be fantastic," he says. "It crosses the river in a place where it's very hard to cross the river right now. It's either up to Hog's Back or over to Bank Street, so this is good for the campus and the park."
The massive one-piece steel structure footbridge was originally installed in July 2022 and, at the time, several city councillors, including Riley Brockington, expected an opening within four months. That did not happen.
"We learn now that the contract is tied with the opening of the LRT Line 2," says Brockington.
The bridge and its installation is part of the original Stage-two LRT proposal.
- Sign up now for daily CTV News Ottawa newsletters
- The information you need to know, sent directly to you: Download the CTV News App
"So as long as Line 2 is postponed, this bridge, per contract, does not does not have to open," Brockington says. "My argument is there's so little work left, basically electrical connections and some of the top bridge work weatherproofing."
Brockington wants the footbridge opened by this summer. City staff note that in order to complete work on the bridge, sustained above-zero temperatures will be needed.
CTVNews.ca Top Stories
DEVELOPING 122 active wildfires burning across Canada, 32 considered 'out of control'
The 2024 wildfire season has begun, and it's shaping up to follow last year's unprecedented destruction in kind, with thousands of square kilometres already consumed.
B.C. parents sentenced to 15 years for death of 6-year-old boy
A British Columbia Supreme Court judge has sentenced the mother and stepfather of a six-year-old boy who died from blunt-force trauma in 2018 to 15 years in prison.
Veteran TSN sportscaster Darren Dutchyshen has died
Veteran TSN broadcaster Darren 'Dutch' Dutchyshen, one of Canada’s best-known sports journalists, has died. He was 57. His family says 'he passed as he was surrounded by his closest loved ones.'
Miller scores late as Canucks grind out 3-2 win over Oilers in Game 5
J.T. Miller scored in the final minute of the game and the Vancouver Canucks came back for a 3-2 victory over the Edmonton Oilers in Game 5 of their second-round playoff series Thursday.
Think twice before sharing 'heartbreaking' social media posts, RCMP warn
Mounties in B.C. are urging people to think twice before sharing "heartbreaking posts" on social media.
Police issue Canada-wide warrant for Regina homicide suspect
Police have issued a Canada-wide warrant for a man wanted in a homicide which occurred in Regina on May 12.
Trudeau calls New Brunswick's Conservative government a 'disgrace' on women's rights
Prime Minister Justin Trudeau assailed New Brunswick's premier and other conservative leaders on Thursday, calling out the provincial government's position on abortion, LGBTQ youth and climate change.
Kevin Spacey receives star support as he fights to get his career back
Kevin Spacey is pushing back on the 'rush to judgment' against him and is being backed by some big names as he seeks to reclaim his acting career.
Speaker cuts ties with Sask. Party, alleges he faced threats, harassment from gov't MLAs
The Speaker of the Saskatchewan Legislature Randy Weekes has severed ties with the Sask. Party after accusing some members of harassment and intimidation tactics, including a situation he claimed saw the Government House Leader bring a hunting rifle to the legislative building.