Highbridge Construction owes $106,000 in rent on storefront
There is a new sign of financial issues with an Ottawa construction company that suddenly closed, leaving customers with unfinished projects unable to recoup their losses.
A notice of distress posted on the door of Highbridge Construction's storefront on St. Joseph Boulevard says the company owes the landlord more than $106,000 in rent.
- Download our app to get local alerts to your device
- Get the latest local updates right to your inbox
The notice is dated Feb. 7 and gives the tenant five days to reply, or else goods within the unit will be seized and sold to cover the costs
The lease has not been terminated and while the locks have been changed, the tenant is still able to use the premises with the landlord's permission, the notice says, though it warns attempts to remove goods from the site is unlawful.
Highbridge Construction shuttered last week, telling employees in an email obtained by CTV News that it was "forced to close its door and cease business operations." Another email to employees had asked them to hold off on cashing paycheques until Monday, offering Air Miles to those who waited.
Customers who spoke to CTV News describe being out tens, if not hundreds of thousands of dollars. In at least one customer's case, the money was uninsured and she has no way to recover it.
Attempts to reach the owners of the company have been unsuccessful.
MORE FAMILIES AFFECTED BY CLOSURE COME FORWARD
More families are sharing stories with CTV News about work that has gone unfinished.
Amanda Lauzon, a mother of four, hired Highbridge Construction to complete repairs on her home after a fire in 2019. The job has never been finished she said.
"We are in year four now and the project still isn’t complete, we still have odds and ends," she told CTV News. "We have had no contact since November."
Lauzon said in addition to incomplete work, several things needed to be redone.
"You couldn’t walk around the dishwasher because it was up against the kitchen counter," she explained. "A toilet seat that doesnt go up all the way. The seat doesn't open all the way because of the handle."
Her shower was redone three times and tiles are already starting to wear and three counter tops had to be replaced because workers drilled the wrong holes.
"They just assumed i had ordered a standard 3 hole fixture," Lauzon said. "And when this came in, the guy was like, 'You are going to have two holes in your counter.' I said that is unacceptable. 'Well, do you like the taps we put in? You could keep them.' If i wanted them, I would have ordered them.'"
Lauzon estimates her family is out at least $200,000. She intends to hire another contractor to get the work done.
"We will move on and forget this chapter."
Werner Meier's roof was damaged by the derecho in May. He hired Highbridge Construction and gave them a deposit.
"White pines came through the garage roof like torpedos and took out nine of 13 trusses," he said. "The entire garage roof needs to be replaced."
However, he says all the company did was take measurements and he hasn't heard back from them since January.
"Their contact requirements were very stringent. They argued they needed 50 per cent of the cost of the repairs up front, which is what we gave them."
Meier said that deposit was $55,000.
--With files from CTV's Graham Richardson and Leah Larocque.
A notice of distress taped to the door of Highbridge Construction's storefront on St. Joseph Boulevard in Ottawa. (Graham Richardson/CTV News Ottawa)
CTVNews.ca Top Stories
El Nino weakening doesn't mean cooler temperatures this summer, forecasters say
As Canadians brace themselves for summer temperatures, forecasters say a weakening El Nino cycle doesn’t mean relief from the heat.
BREAKING 15-year-old boy stabbed in Ottawa on Thursday dies
A 15-year old boy who was critically injured after a stabbing in Nepean on Thursday has died of his injuries, Ottawa's English public school board said Sunday.
Dash cam catches moment suspected drunk driver hits parked car, sends it careening into North Shore flower shop
Police say it’s fortunate no one was injured or killed in a collision at North Vancouver’s Park and Tilford shopping centre Saturday evening that sent one vehicle careening into a flower shop and another into a set of concrete barriers outside a Winners store.
Nylander defends Leafs' core after playoff exit, Toronto again picks up the pieces
The Maple Leafs battled back from a 3-1 series deficit against the Boston Bruins with consecutive 2-1 victories - including one that required extra time - in their first-round playoff series to push the club's Original Six rival to the limit before suffering a devastating Game 7 overtime loss.
Amid climate change warnings, Canadians lukewarm on electric vehicles
Amid scientists' warnings that nations need to transition away from fossil fuels to limit climate change, Canadians are still lukewarm on electric vehicles, according to a study conducted by Nanos Research for CTV News.
Three dead, two hospitalized, following collision in Fredericton: police
Three people have died and two have been hospitalized after a speeding car struck a tree and landed on another vehicle in Fredericton Sunday morning.
Montreal man on the hook for thousands of dollars after a feature on his Tesla caused an accident
A Montreal man is warning Tesla drivers about using the Smart Summon feature after his vehicle hit another in a parking lot.
Madonna's biggest-ever concert transforms Rio's Copacabana beach into a massive dance floor
Madonna put on a free concert on Copacabana beach Saturday night, turning Rio de Janeiro's vast stretch of sand into an enormous dance floor teeming with a multitude of her fans.
Mexican authorities say thieves killed 2 Australians and an American to steal their truck
Thieves killed two Australians and an American on a surfing trip to Mexico in order to steal their truck, particularly because they wanted the tires, authorities said Sunday.