OC Transpo introducing new R1 Express route as O-Train shutdown enters a third week
OC Transpo is introducing a new R1 Express bus between Blair Station and downtown Ottawa this week, as the O-Train will remain out of service until at least the second week of August.
Transit Services general manager Renee Amilcar announced the new R1 Express will run every 15 minutes on weekdays between Blair Station and Mackenzie King Bridge and Albert Street.
"OC Transpo has listened to and heard the feedback from customers on R1 bus service and is responding," Amilcar said in a memo to Council Sunday morning.
"This service will be in addition to the existing R1 bus service, which continues to operate on the same service pattern and schedule. The R1 Express service will run westbound on weekday mornings and eastbound during weekday afternoons and will offer our customers an additional travel option during the busiest commuting times."
R1 buses will continue to run between Blair and Tunney's Pasture stations.
Transit Commission Chair Glen Gower tells CTV News Ottawa commuters in the east end have been experiencing trips of at least an hour on the R1 service.
"This is something that people in the east end have been asking for and the councillors in the east end have been raising as a concern,' Gower said about the reason for the new R1 Express service.
"That will be a big improvement for people who are coming in from the far east end of the system."
OC Transpo had hoped to resume partial service on the O-Train Monday morning with eight single-car trains, but Rideau Transit Group informed the city Friday afternoon that more work on the tracks is needed before service resumes.
Details on the "risk assessment" plan to fix the tracks will be released on Monday, but Amilcar has already said it will take at least 10 days to complete the track infrastructure work and resume service. That means it could be the second week of August, at the earliest, before LRT service resumes.
CTVNewsOttawa.ca looks at what you need to know about the O-Train shutdown and the R1 replacement bus service heading into week three with disrupted service.
R1 replacement bus service
R1 replacement bus service continues to run between Blair and Tunney's Pasture stations while the O-Train is out of service.
"The revised R1 route is operating well, and we continue to monitor it closely," Amilcar said in a memo Saturday morning.
In downtown Ottawa, R1 replacement bus service is running along Albert and Slater streets, instead of Queen Street, in a bid to avoid traffic delays.
- Westbound R1 buses are running on Albert Street, with stops at Bank and Kent
- Eastbound R1 buses are running on Slater Street, with stops at Kent and O’Connor
R1 westbound service will stop at each station between Blair and Tunney's Pasture, except for Lees Station.
A shuttle bus is operating between Lees, uOttawa and Rideau stations. Customers travelling to Lees station from the east can connect with the shuttle and eastbound R1 service at uOttawa station.
A shuttle bus is also running between Cyrville and St. Laurent stations to connect customers with R1 bus service.
R1 Express
OC Transpo is introducing a new R1 Express service between Blair Station and downtown Ottawa.
The new R1 Express will run westbound on weekday mornings and eastbound during weekday afternoons.
There will be 12 buses on the R1 Express, with buses running approximately every 15 minutes.
A city of Ottawa spokesperson told CTV News Ottawa Sunday afternoon that the 12 buses providing the R1 Express service will be in addition to the 36 buses running the R1 service between Blair and Tunney's Pasture stations during peak periods.
R1 Express will operate on:
- Monday to Friday, from 6:30 a.m. to 8:30 a.m.: Blair Station to downtown, with service on Mackenize King Bridge and on Albert Street at Bank and Kent
- Monday to Friday, from 3 p.m. to 6 p.m.: Downtown to Blair Station with service on Slater Street at Bank and Kent and Mackenize King Bridge
The R1 Express bus will be identifiable as R1 Lyon Express to travel westbound and R1 Blair Express for eastbound transit riders.
Why was the O-Train initially closed?
OC Transpo abruptly shut down O-Train service during the afternoon commute on Monday, July 17 after an axle-bearing issue was discovered on one train during a routine 50,000 km inspection.
Amilcar told Council that excess grease was found on one axle. Further investigation determined the "bearing play was over the threshold at which it could stay in operation," Amilcar said.
Rideau Transit Group and OC Transpo checked every axle on all trains and completed a track inspection.
A geometrical rail inspection was also conducted along the LRT line and a train equipped with specialized tools was used to measure the forces and loads on the axles of the train.
Three milestones to resume service
Amilcar told reporters that OC Transpo and Rideau Transit Group must achieve three milestones before O-Train service can resume.
Inspection of all rail vehicles
Amilcar says the inspection of all 44 rail vehicles was completed on July 24. Six vehicles were undergoing additional investigations, but no other details were released.
Texelis report
French manufacturer Texelis conducted an assessment and investigation on the "out of tolerance axle hub assembly" that had the bearing issue. Texelis submitted the report to OC Transpo and Rideau Transit Group on Friday.
"Rideau Transit Group is currently conducting a review," Amilcar said.
Safety Note
The return-to-service plan requires a Safety Note provided by Alstom, through Rideau Transit Group.
The Safety Note outlines the parameters of the new "containment plan" for the safe operations of the Confederation Line. That includes the plans for a new inspection and replacement regime that requires the replacement of the leading and trailing wheel hub assemblies and axles every 60,000 kilometres and a new inspection regime for the middle bogies.
The draft safety note was received on Wednesday, according to Amilcar. The head of OC Transpo says RTG informed the city on Friday that the Safety Note requires additional actions to ensure that there is no contact between the "train wheel and the restraining rail."
New requirement for O-Train service
The no contact between the train wheel and the restraining rail was a new requirement announced on Friday.
According to Amilcar, Rideau Transit Group said actions must be taken to ensure there is "no contact between the train wheel and the restraining rail."
"RTG and Alstom have conducted numerous instrumented bogie tests, which have resulted in the need for additional track infrastructure work to ensure that the train wheels do not make contact with the restraining rail," Amilcar said.
"The need for this additional work means that the gradual resumption of service, initially anticipated to occur on July 31, will be delayed."
Rideau Transit Group and OC Transpo said on Friday the position of the restraining rail will have to be modified in 16 locations along the track to ensure there is no contact.
Amilcar said the restraining rails will need to be repositioned "one to two millimetres."
What's next?
OC Transpo and Rideau Transit Group are spending the weekend determining the next steps, including a new risk assessment for the work to ensure the track infrastructure conforms to the new Safety Note.
Amilcar says once the risk assessment is complete, it will take approximately 10 days to complete the track infrastructure work before service is resumed.
More details on the return-to-service plan and the risk assessment will be released on Monday.
Rideau Transit Group and Alstom are also replacing the leading and trailing wheel hub assemblies and axles on all LRT vehicles every 60,000 km.
CTVNews.ca Top Stories
El Nino weakening doesn't mean cooler temperatures this summer, forecasters say
As Canadians brace themselves for summer temperatures, forecasters say a weakening El Nino cycle doesn’t mean relief from the heat.
BREAKING 15-year-old boy stabbed Thursday in Nepean dies
A 15-year old boy who was critically injured after a stabbing in Nepean on Thursday has died of his injuries, Ottawa's English public school board said Sunday.
Dash cam catches moment suspected drunk driver hits parked car, sends it careening into North Shore flower shop
Police say it’s fortunate no one was injured or killed in a collision at North Vancouver’s Park and Tilford shopping centre Saturday evening that sent one vehicle careening into a flower shop and another into a set of concrete barriers outside a Winners store.
Nylander defends Leafs' core after playoff exit, Toronto again picks up the pieces
The Maple Leafs battled back from a 3-1 series deficit against the Boston Bruins with consecutive 2-1 victories - including one that required extra time - in their first-round playoff series to push the club's Original Six rival to the limit before suffering a devastating Game 7 overtime loss.
Amid climate change warnings, Canadians lukewarm on electric vehicles
Amid scientists' warnings that nations need to transition away from fossil fuels to limit climate change, Canadians are still lukewarm on electric vehicles, according to a study conducted by Nanos Research for CTV News.
Three dead, two hospitalized, following collision in Fredericton: police
Three people have died and two have been hospitalized after a speeding car struck a tree and landed on another vehicle in Fredericton Sunday morning.
Montreal man on the hook for thousands of dollars after a feature on his Tesla caused an accident
A Montreal man is warning Tesla drivers about using the Smart Summon feature after his vehicle hit another in a parking lot.
Madonna's biggest-ever concert transforms Rio's Copacabana beach into a massive dance floor
Madonna put on a free concert on Copacabana beach Saturday night, turning Rio de Janeiro's vast stretch of sand into an enormous dance floor teeming with a multitude of her fans.
Mexican authorities say thieves killed 2 Australians and an American to steal their truck
Thieves killed two Australians and an American on a surfing trip to Mexico in order to steal their truck, particularly because they wanted the tires, authorities said Sunday.