NCC lays out design principles for Alexandra Bridge replacement, to be complete in 2032
The National Capital Commission has approved its design philosophy for the eventual replacement of the 120-year-old Alexandra Bridge over the Ottawa River.
In a meeting Wednesday, the NCC's board of directors approved the planning and design principles for the future bridge, one of the first of many steps in a 12-year-long process.
"Developed in collaboration with the project lead, Public Services and Procurement Canada (PSPC), the principles provide guidance in the areas of planning, heritage protection, urban design and sustainability," the NCC said in a release. "They will enable a future designer to develop an iconic proposal reflective of the bridge’s location and significance, while implementing innovative practices to meet key goals such as low environmental impact."
The NCC says six principles will help guide design choices:
- mobility and continuity of the urban fabric;
- public space and civic experiences;
- structure, height, proportions and lighting;
- preservation of views and celebration of the bridge’s legacy;
- sustainability and materiality; and
- universal accessibility, legibility and wayfinding.
First built in 1900, the Alexandra Bridge is now one of the major connectors between Ottawa and Gatineau, with thousands of crossings per day, accounting for about nine per cent of the average daily interprovincial vehicle traffic, and about 33 per cent of all pedestrian and cyclist crossings.
The Alexandra bridge spans the Ottawa river and connects Ottawa and Gatineau.
The Canadian Civil Engineering Society declared the bridge a national historic civic engineering site in 1995.
Public Services and Procurement Canada says maintaining the current bridge for the next 25 years would cost approximately $342 million, whereas replacing the bridge would cost between $194.4 million and $408.8 million, depending on the type of replacement. Three options were chosen, a contemporary slab-on-steel girder bridge, a steel truss replacement-in-kind (similar to the current bridge) and a signature tied-arch structure.
"The project presents a unique opportunity to reimagine this vital connection between Ottawa and Gatineau, which offers one of the most breathtaking views of Parliament Hill and national symbols. Located in the heart of the Capital on the traditional territory of the Algonquin Anishinabe, the Alexandra Bridge occupies a space rich in symbolism and history," the NCC said.
The NCC plans to hold several more phases of public consultation as designs are submitted. Construction on the replacement span is expected to begin in 2028, with bridge completion by 2032.
A cyclist makes their way over the Interprovincial Bridge in Ottawa on Wednesday, Nov. 4, 2020. (Sean Kilpatrick/THE CANADIAN PRESS)
Timeline
Phase 1: Project pre-planning stage (2020–2021)
- Development of vision, including planning and design principles
- First public consultation: vision, along with planning and design principles, including potential impacts and mitigation (completed)
Phase 2: Project delivery stage (2021–2025)
- Development of design options
- Second public consultation: conceptual design options and evaluation
- Third public consultation: functional and preliminary design of the preferred concept
- Fourth public consultation: detailed design for construction tendering
Phase 3: Procurement and implementation (2025–2032)
- Fifth public consultation: final design and construction plan
CTVNews.ca Top Stories
'They needed people inside Air Canada:' Police announce arrests in Pearson gold heist
Police say one former and one current employee of Air Canada are among the nine suspects that are facing charges in connection with the gold heist at Pearson International Airport last year.
House admonishes ArriveCan contractor in rare parliamentary show of power
MPs enacted an extraordinary, rarely used parliamentary power on Wednesday, summonsing an ArriveCan contractor to appear before the House of Commons where he was admonished publicly and forced to provide answers to the questions MPs said he'd previously evaded.
Leafs star Auston Matthews finishes season with 69 goals
Auston Matthews won't be joining the NHL's 70-goal club this season.
Trump lawyers say Stormy Daniels refused subpoena outside a Brooklyn bar, papers left 'at her feet'
Donald Trump's legal team says it tried serving Stormy Daniels a subpoena as she arrived for an event at a bar in Brooklyn last month, but the porn actor, who is expected to be a witness at the former president's criminal trial, refused to take it and walked away.
Why drivers in Eastern Canada could see big gas price spikes, and other Canadians won't
Drivers in Eastern Canada face a big increase in gas prices because of various factors, especially the higher cost of the summer blend, industry analysts say.
Doug Ford calls on Ontario Speaker to reverse Queen's Park keffiyeh ban
Ontario Premier Doug Ford is calling on Speaker Ted Arnott to reverse a ban on keffiyehs at Queen's Park, describing the move as “needlessly” divisive.
'A living nightmare': Winnipeg woman sentenced following campaign of harassment against man after online date
A Winnipeg woman was sentenced to house arrest after a single date with a man she met online culminated in her harassing him for years, and spurred false allegations which resulted in the innocent man being arrested three times.
Woman who pressured boyfriend to kill his ex in 2000s granted absences from prison
A woman who pressured her boyfriend into killing his teenage ex more than a decade ago will be allowed to leave prison for weeks at a time.
Customers disappointed after email listing $60K Tim Hortons prize sent in error
Several Tim Horton’s customers are feeling great disappointment after being told by the company that an email stating they won a boat worth nearly $60,000 was sent in error.